(1)
Chenggang Zheng; Tang, Y.; Wang, W.; Kang, Q. Order Driven Disassemby Worker Scheduling for Multi-Factory Remanufacturing Optimization. IJAIGM 2026, 2 (1). https://doi.org/10.67119/4729kfjd.